This blog will chronicle the lives of eight Tauber Institute for Global Operations students during their summer internships. The summer internship is the capstone of the Tauber Program and we wanted to share our experiences with prospective students. For more details about the Tauber Institute, please visit http://www.tauber.umich.edu/.

The internships will begin on May 9th and run through mid August. Check back frequently to see what the Tauber students have been up to!

Monday, July 25, 2011

Powered by 500+ Horsepower at General Motors


Wow, time flies! Sorry for the lack of updates, but it’s not for a lack of material or activity. We’re in week 12 here at General Motors, so nearing the finish line. It has been an amazing project thus far. One of the benefits that I’ve seen of Tauber Projects, relative to other MBA internships, is the amount of planning and focus that the project has. Having a sponsor that is engaged in the project, and has done a significant amount of work coming up with a potential scope is extremely important. Instead of showing up to the company and trying to figure out a project for the first few weeks, Tauber projects are generally well thought out and the sponsors often work with you even before you arrive so that you can hit the ground running.

Ed Grubb, my Tauber project partner, and I have been “pedal to the metal” here at GM examining supplier sourcing strategies and how we can best utilize them in key areas to expedite the overall vehicle development process. We’ve had to leverage a lot of our project resources, including our librarian back at the business school, our faculty advisors, as well as our communications coach.

Moving beyond what someone might consider typical “operations” for a predominantly engineering and manufacturing driven company like GM, our recommendations have as much to do with the overarching strategy as well as the physical operations that result from them. We have looked at academic research, case examples from both within and outside of the automotive industry, and the current state analysis of supplier relationships at GM. We then proceeded to focus on a few key areas to study product development and work directly with a cross-functional team within GM and with suppliers to come up with specific process changes that could be proposed for full implementation. While this would represent a drastic shift in culture for GM, we have been given direct and open access with executive level management from all departments and shared our initial findings and hypothesis with them. We used their input and guidance to help formulate our final recommendations, which we are now in the process of presenting back throughout the company.

So we feel like we’ve been working hard for the past 11 weeks, and still have a lot to go through in the next few until the “Spotlight!” presentations in September, but we’re pretty excited to share our results with everyone! Through the help of our sponsors and faculty advisors, we may also look to get our final paper published!

It’s not all work all the time though. We definitely have been given the opportunity to explore and have fun. We have visited supplier and GM factories as well as the GM Powertrain development facility to see the engine test cells. We were able to visit the Battery Assembly Plant, where they put together the batteries for the Chevy Volt. One trip got us into the wind tunnel, where GM was busy testing the aerodynamic properties of a full-scale clay mockup of the next generation Cadillac Escalade. Sorry, no pictures allowed in there, haha. On a daily basis we also see running prototypes of the upcoming Cadillac XTS and ATS and Chevrolet Malibu sedans running around the campus as well as others that are yet to be named… Another great perk is the Ambassador program at GM, which allows employees to reserve and use nearly any car in the GM fleet for either the work week, or a weekend. A few weeks ago I was able to find a Cadillac CTS-V Coupe (pictured above) to use for my weekend trip down to Cleveland. With 556 horsepower, and a 0-60 mile per hour time of 3.9 seconds, if you have the means, I’d highly recommend one. I can even extend you my employee discount. =)


Monday, June 20, 2011

Cardinal Health through 6 weeks

It has been a while since I have posted in the blog, so there will be a lot to update on from the first six weeks of my Tauber Project at Cardinal Health (CAH). In short, we have been very busy working on the project and are currently preparing to pitch some of our suggestions to the management teams at CAH. The ability that we have had to shape the project has been a refreshing change from previous corporate internships where you may be given more more task related work. Along with my team we have, with the help of the CAH managment, been able to totally scope and control the direction of the project. I think that part of the allure of these projects for the companies is that they are able to give basic guidance to the student teams and then allow them to run with the ideas and craft totally new knowledge for the companies.
To step away from the internship for a bit, I am currently living in a extended stay hotel. Most of the Tauber sponsors provide housing or at least housing assistance during the summer. I have been able to enjoy the luxuries of daily maid service and free breakfast and dinner during my stay. It may be a wake up call when I return to the UM in the fall and the dishes don't do themselves!

To shift back to the project that my team has been working on, the sheer scale of the operations are incredible. I think this along with the industry were some of the things that drew me to the project. It is incredible for us to look at the changes we are making in a small subset of products and then look at the potential if theses changes can be scaled company wide. It is a surprisingly scary but empowering felling to have this much influence. At least in my case, the sponsor company has done a great job of getting our team access to all of the information that we need. There is no hesitation allowing us to talk to different VP's about our project. I think in the first week we talked with 3 VP's who have all been supporting our project since.

Despite being located in Waukegan, IL our team has been able to do some exciting traveling. Just a few weeks ago we spent a week in El Paso looking at some of the companies operations at a large replenishment center.
We worked long hours, but were still able to enjoy some great Mexican food and checked out the UTEP campus. CAH was event nice enough to get us a sexy red 4 cylinder Chevy HHR for the weekend!

I will try to post a picture that we took with the team in El Paso, but I can't seem to find a good one right now.

I am looking forward to presenting our preliminary findings in the next few weeks and then working to add our advisers recommendations to our findings. Our whole team is hoping that we will be able to being our pilot project to verify our findings soon!

Friday, June 17, 2011

Oh yeah...the blog...

Its been quite a while since I last posted here... but trust me its all in good reason. My Tauber project here at General Mills has been keeping me quite busy (as does any Tauber project to be honest.) For those of you looking into Tauber I encourage you to think of a Tauber project like so....

Imagine your typical internship: a steep learning curve of the company (culture, methods, hierarchy...), industry (key drivers, trends, competition...), and the division you are placed in (history, role, importance...). Oh yeah, I failed to mention the actual tasks / responsibilities you are to complete by summer's end. This usually has a few deliverables, pending on what you are doing, such as a tool or model, a plan, statistical analysis, a report, etc. This is not to mention the time it takes to get acclimated to your surroundings and enjoy yourself wherever you are staying.

Now, imagine that internship experience is a balloon animal. It takes a while to learn how to make it, get comfortable with your material, and create some sort of creature from it. After a while you figure it out and finish your task at hand, usually with something that looks like this...
.

To put a Tauber project into comparison, its like taking your typical balloon animal (a dog) and making trying to make it into something like this...

The project is longer (14 weeks v. a typical 10 weeks), there are more "legs" under scope (cross division relationships, larger tasks, integration), and higher expectations (both from the amazing sponsors and yourselves.) The projects are certainly great tasks that tie operations concepts to vital business needs. Oh, and there's an academic report that I forgot to mention...

If I am scaring you, let me clarify something before you stop reading... The Tauber Institute sets you up for success! First, the projects are scoped before they are even pitched to ensure students can make an impact. Second, you gain great training / exposure in modules (as mentioned in previous posts) and the detailed structure of deadlines. Third, you get access and the strong support of a Team Dynamics Coach, Communications Coach, Faculty Advisors, and Co-Director. In other words, you and your partner are not alone. To put things back into perspective.... think of creating an "Elmo" balloon animal on your own when you are just trying to figure out how to make a dog! You need the help of a friend or clown (okay, this is not a good comparison anymore... but you get my point...)

Back to my project! Since my last post I've learned a great deal more about the CPG industry, past efforts to solve this Chewy capacity planning issue, and most importantly what drives decisions here. In a nutshell, I've assessed the original project scope and made a proposal to solve these issues. To solve the issues that currently exist, my partner and I are working on two models: 1) a model to help the day to day tasks and scenario planning (done in Excel) and 2) a model to aid in long term optimization (done in a program titled GURU.)

Now, I am not an expert modeler in Excel, and had no idea of GURU before I came here, but I've been working with two modeling teams in India to revamp an existing model and build a robust optimization model. We meet twice a week (on average) and discuss which input data to use, how granular the detail needs to be, and other questions of the like. If this wasn't enough, my partner and I have been looking into the workflow of how these efforts will be implemented once the tools are in place. This is the most challenging part as the tools and processes currently do not exist, past efforts had inter-dependency bottlenecks, and these tools will be new (or updated) from the current process.

The great benefit of both tasks is how much I am learning. This includes things like how to influence people, how to the impact of technical drivers, or where to go when you need an answer. I've met over 45 people to date and each has had a contribution to our project and our thought process. As a summary, I love what I'm learning and have learned so much. The project is challenging, as are the academic responsibilities, but you have all the resources you need!

Also, I should share that I had my "mid-point review" yesterday with my Faculty Advisors, Co-Director, and General Mills team. We discussed our learnings, progress to date, and future steps. The feedback we received was not only helpful but positive! Hence, I pat myself on the back and am ready to keep moving! Shocking this is nearly the "mid-point" of the summer already!

Following our 3 hour get together, a few of us attended a Tauber Alumni Dinner in the city. We went to an outstanding restaurant called "112 Eatery" which left the crowd (GMI employees, Tauber Faculty, Alumni) full and satisfied!

Minneapolis Tauber Alumni Dinner Attendees
From left to right: Tom Hamilton (Tauber Student), Judy Jin (Faculty Advisor), Bruna Ferro (Tauber Alumni), Natalie Henderson (Tauber Alumni), Lindsay Lyons (General Mills), Billie Fienhage (General Mills), Al Woodliff (Tauber Co-Director), Paul Lokar (General Mills), Mike Peterson (Tauber Alumni)

Looking forward, I cannot promise when I will post next. What I can promise is that my Tauber experience will impact me as an employee, leader, and person (if it hasn't already!) Until next time, enjoy the great summer weather wherever you may be! I'll be busy coaching baseball (http://www.miracleleaguemn.com/about.html) and enjoying the outdoors!





Monday, May 23, 2011

General Mills - Weeks 1 and 2


Wow! Just realized that this blog hasn't gotten much action since April. Hence, let me keep it short and try to provide an update on my summer experience(s).

Since graduation, I've been able to catch my breathe with my family and gear up for the summer ahead. I took a week to enjoy my friends in Ann Arbor before they all departed and then moved out of my apartment. After spending a week with my family and friends in Troy (suburb of Detroit) I reloaded nearly everything I had in it on the way home and got it ready for Minneapolis.

My dad and I then took 2 days to drive to Minneapolis as we stopped in Chicago and stayed with my Uncle. The drive took about 12 hours, or 10 with my lead foot, but served as a great bonding period. We spent a two days together and ventured around Minneapolis as I set up and got ready for work.

Okay... now the Tauber stuff. We were greeted on our first day of work and I couldn't believe it. The Snacks Division hooked me up... (see below)


Snacks, a welcome Teddy, and my new Mug!

Honore and I spent our first week or so re-scoping our project and learning more about the whole General Mills company / Snacks industry. With all the jargon of chewy bars and production lines, we were ultimately led to Hannibal, MO to view a real production line. We returned on Friday and grabbed a meal together. It was eye-opening to reflect on how much we had learned in that first week alone! Our second week included meetings with upper management (great exposure!) and much more learning. I could go on and on about chewy bars and whatnot but I think I'll save that for Spotlight! (and the Fall). However, I should share the fact that I've felt very positive about the access to top management and interest people have here for our project. General Mills has been an awesome sponsor thus far!


Outside of work, I've been able to enjoy the amazing Minneapolis outdoors, improve my cooking, and explore the city. It was also my birthday, which led me to a few bars near Target Field, home of the Twins. There seems to be a real love for baseball (sadly the Twins), food, and shopping around here. In other words, I may spend every penny I make... but a penny well spent. I've also been exercising a lot as General Mills (and Minneapolis for that matter) is a very active place! Everyone seems to be either doing triathlons, or one-upping me in some way... who knows maybe I'll do the Warrior Dash (Warrior Dash)!?!

Anyways, one thing I will be doing is helping with the Minneapolis Miracle League as I hope to help children learn some baseball and make some friends! Games are on weekends, so it'll serve as great release. Until then, I'll continue to brainstorm about my experience and hope to share in the next three weeks. Cheers!

An overcast view from our apartment - note the skywalks!


By the way, deadly storms have come through here (not quite as bad as those in Missouri) and tornado sirens have been frequent. I should note that we are safe and my thoughts are with those affected!


Tuesday, April 12, 2011

Changes, Challenges, and Cheer(ioes)!

Greetings and hello again! It's a busy time of year here in Ann Arbor as classes begin to wind down, MBA 1's wrap up their MAP projects, and the weather warms up! One of the biggest changes and challenges is being able to focus on final exams and projects when all you want to do is be outside! Though there is another change upon us.

As graduation nears and many EGL / graduate students register for Fall courses, many of the friends I've made over the last few years gear up to depart from Ann Arbor for "the next step" in their careers. I'm referring to students that are not pursuing a fifth year of graduate school or finishing up their Tauber experience. The majority of these individuals were folks I've been close with since freshman or sophomore year; there's no doubt that I will miss each and every one of them. However, I am confident that I will have a strong network of friends next year due to EGL and The Tauber Institute. It sure is an amazing network that you inherit!

As many of my Tauber colleagues have noted, there are many steps that occur before students secure their Tauber internship. Though I could write about these steps, I'd like to focus my topic on the steps that follow. Following the selection of your company, students celebrate their assignment at an initial "Kick-off Dinner" where you formally meet your teammate(s) and faculty advisors. This is truly an exciting time, as the "picture becomes clearer" on what your summer will actually look like. As I noted in my previous post, I will be working for General Mills in Minneapolis, MN. My partner is an MBA, named Honore, and I am very grateful to be able to share this experience with him!

Like the rest of the teams, Honore and I began to meet and discuss our project and leadership styles. We went through a week of Tauber modules that focused on our team and project. Topics included: Team Dynamics, Project Management, and Cultural Awareness. Together, we also met with a team dynamics coach who will guide our relationship and check in with us throughout the summer. A few other things that we worked on were a Team Charter, which outlined our roles and responsibilities, working standards, and methods to use throughout our project experience. We set goals in this charter and are looking forward to seeing how we can meet them!

On a lighter note I should share the fact that General Mills sent both Honore and me a congratulatory gift basket full of cereal, snacks, and other goodies. It was very nice gesture and a great example of how Tauber sponsors value their interns! In just two days, Honore and I will make an initial site visit to Minneapolis to meet the General Mills team we will work with this summer, tour the facility, and scope our project. I am ecstatic to once again, "clear the picture" and excited to make some great connections within the office!

General Mills Headquarters (My Future Office) near Minneapolis, MN

Before I finish this post, I thought I'd note the other fun activities that the Tauber Student Advisory Board (SAB) put together to build stronger relationships. Over the last two weeks, we had a social night at a local bar and ventured out to a beautiful day at Comerica Park to catch a game between the Detroit Tigers and Kansas City Royals. From the buses, to the tickets and food, I not only felt like a VIP but met some more colleagues within the program. Below is a picture of us at the game! To add to the fun times, the weather was nearly 80 degrees!

Tauber Students at the 4/10 Detroit Tigers Game

I hope to update you all on my site visit in the near future as I am pretty Cheer(io)-ful about the trip ahead! Again, please feel free to post any questions or comments as well! Seacrest... out!

Tuesday, April 5, 2011

General Motors!

Well, as I said before, my Tauber Summer Project is at General Motors right here in Michigan. The guaranteed summer internship is a huge benefit of being in Tauber. As I saw (and continue to see) my MBA classmates searching for internships, it was a huge weight off my shoulders to know that I'd have a project that was thoroughly vetted by the Tauber Institute staff and is sponsored by a great group of companies. Throughout the year we have opportunities to meet and interact with sponsor companies whether it's at Spotlight in the Fall, the Global Operations Conference in November, or at other Tauber Modules or general recruiting functions at Ross. It is apparent that the companies really value these projects and the work that Tauber students have done in the past. The interview and bidding process is really condensed into the 2 week time frame which makes it somewhat hectic, but is nice that it's only for that short period of time rather than drawn out over many many months.

Yes, after the interviews are complete, it is a little tense as you wait to hear what the "black box" or the "algorithm" will spit out for your summer placement, but in general you really can't go too far wrong with the great projects that are lined up. My General Motors project will be focused on their supplier integration strategy and I'm teamed up with a good friend and classmate Ed Grubb. We're going on one of our initial site visits this Thursdays down to a supplier's production facility. Our faculty advisors for the project and our project sponsor are extremely engaged in making sure this project is successful for all parties involved. They've given us a wealth of background knowledge that I'll try to chew through while finishing up my MBA MAP project this month. I wonder if they'll give me a Chevy Volt to use for the summer....

Initial site visit turns into an unexpected adventure

About a year ago in 2010, my project partner Saurabh and I, arranged to go on our initial site visit to the BorgWarner Markdorf plant. We arrived in Zurich on April 12th and were picked up by an arranged taxi. Our first stop was the plant, where we met with the Managing Director and project champion Hannsjoerg Herrmann, the Human Resources Director Karsten Weber, as well as our project supervisor Philip Schuster. We enjoyed a classic European lunch - sandwiches with fresh cheeses, breads and smoked meats, and then headed off to a tour of the manufacturing facility, which was followed by a brief introduction to our summer project. Saurabh and I had the afternoon off, and decided that we would get some rest at the hotel before going for dinner. BorgWarner was incredibly hospitable and had arranged for us to stay at a very nice local hotel called Hotel Bischoffchloss, which when translated from German, means Bishop's Castle.

The second day of our site visit was spent in meetings with different teams of colleagues that we would be working with over the summer, such as the 'Tauber Team' and the 'Lean Team'. We also took the opportunity to sort out some administrative and HR issues like our work VISAs and accommodation over the summer. Saurabh and I then had dinner with our project supervisor and Janine from the HR department at the popular lake region of the area, Friedrichshafen. Throughout the entire night, Saurabh and I received the warm hospitality of both Philip and Janine, as they introduced the local area, sights and lifestyle.

The third and last day of our site visit had a similar agenda to Day 2, but having been exposed and introduced to the plant, Saurabh and I were able to pose our own questions to gain a better understanding of our project. We also began writing up our initial project proposal, which I believe was due pretty soon by that time because we had our site visit late.

The next morning, Saurabh and I were once again picked up by a taxi to go to the Zurich
airport, which is about 2 hours away, for our flight back to Detroit via Amsterdam. The cab ride there was uneventful, and so was the first leg of our flight. At the Amsterdam airport however, we boarded our flight and sat waiting in the cabin for about half an hour as the plane waited on the runway for the go-ahead to takeoff. Suddenly, the pilot's voice came through the intercom, only to inform us that our flight had to deplane because no more flights could leave from the Amsterdam airport. Guess what? The volcano at the Eyjafjalla Glacier had erupted, causing severe disruption to the European airspace... Hence, we were trapped in Amsterdam.

Airport personnel could not tell us when we would be able to fly out of Amsterdam, except that it would not be soon. The general advice then was to find a hotel to spend the night, or the next few nights, since there was likely to be a large backlog of flights before passengers would be able to get on a flight out of the city. Annoyed and a little confused, we called Philip, our supervisor, and explained the situation to him. He advised us to book hotel rooms for the night, and said that BorgWarner would reimburse us for the cost of the rooms.

Needless to say, the lines for hotel bookings were LONG. All the reservation desks were crowded with trapped passengers, as were the public phones and free-of-charge direct dial phones to hotels. As you might expect, hotel room prices were quickly going sky high. Fortunately, our engineer-brains kicked in and we quickly popped open our laptops and connected to the airport wi-fi network, and then started searching for hotel rooms online. Within 15mins, we were brisking past lines of commuters waiting to get hotel rooms reserved, and heading to the taxi stand for a ride to our hotel. And so, we spent the first night at Inntel Hotel Zaandam, in the comfort of each of our own rooms, away from the stress of the airline ticket counters.

In the following 4 days, we spent 3 more nights in 2 different hotels while making daily trips to the airport to find out what the situation was with regards to flights and the airspace. Finally, on the 4th day, we decided that there was no way we'd be getting out so soon, and trips to the airport were becoming futile as no one knew when flights would leave. Tickets were not going to be sold anyway, since the airlines would simply allocate backlogged passengers to the earliest flights possible. So, I took up the offer of a friend who facebooked me about being in Amsterdam on exchange, and he brought us on a day tour around the city! (Left: us at the Heineken Brewery in Amsterdam) We also lunched on some pretty authentic middle eastern food as we walked the streets of Amsterdam, which smelled distinctly of magic brownies (no we did not have any)...

Finally, Saurabh and I were put on a flight back to Detroit on the 5th day of what I like to call our 'accidental Amsterdam escapade', just in time for the many make-up exams that we had missed because of the volcano eruption.